Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
That'll be a fortnight thenThere was talk from Nick Barnes at the time that the part needed would take somewhere between 8 and 12 weeks to arrive
May well cost in the tens of thousands to put right if it's really bad. Just what we need , hopefully just need a few parts and not a full rewireIt was a miracle the games were played was the only thing said
Didn't go into details as far as I can recall
Apparently the problem was down to a dozy clown on the footbridge site sticking machinery through the mains cable the previous night. Took out all the power in the Hilton too. Source: a member of the Hilton management team.I think my favourite part of the talk in was Davison saying that no other club our size could manage to run the stadium on generators as if it was an achievement
Nee other club our size would have to!
The power cut pretty much blew the substation.There was a fault with the switchgear in the substation. It usually takes a good few weeks to order, plan and install new equipment in large substations
I'd heard it was to do with the new bridge build alsoApparently the problem was down to a dozy clown on the footbridge site sticking machinery through the mains cable the previous night. Took out all the power in the Hilton too. Source: a member of the Hilton management team.
It really isn't thoughWell we've got until 29th November for the night game. Tense times.
If it’s owt like the players when they break down it’ll be 8 - 12 months!There was talk from Nick Barnes at the time that the part needed would take somewhere between 8 and 12 weeks to arrive
The City in the 80’s regularly Friday afternoon some workman drilled through a cable.Apparently the problem was down to a dozy clown on the footbridge site sticking machinery through the mains cable the previous night. Took out all the power in the Hilton too. Source: a member of the Hilton management team.
It really isn't though
Didn’t he say it's the first time a stadium that size has been ran on generators in this country? You've twisted a couple of things from the other night mind.I think my favourite part of the talk in was Davison saying that no other club our size could manage to run the stadium on generators as if it was an achievement
Nee other club our size would have to!
We ran a night game on them already.Well we've got until 29th November for the night game. Tense times.
Didn’t he say it's the first time a stadium that size has been ran on generators in this country? You've twisted a couple of things from the other night mind.
We ran a night game on them already.
Well what you've just said isn't what I recall him saying. Also using words like 'insinuated" to suggest KLD would want further investment in the future. You also said that it doesn't look like a lot will happen in January, despite being told Harvey was currently in South East Asia. You play a straight bat on here, so Im just doing the same. It's all in the other thread.I’ve twisted absolutely nothing whatsoever
It really isn't though