Cracking photos
think a poster earlier said mid September....The barge we used isnt due into Rotterdam port in the next 72 hoursWhen are the next 2 sections due, some say next week.
Next scheduled lifts are middle of next month
I hope the ham and pease pudding was served in a stottie.You must be logged on to see external links
You must be logged on to see external linksYou must be logged on to see external links
Our team on the New Wear Footbridge recently welcomed students from the Institute of Concrete Structures at Technisches Universität, Dresden to the site. The group, which included twenty students, three research assistants and a professor, were on a twelve day tour of bridges throughout northern England, Scotland and Wales.
The students were given a presentation from our senior engineer whilst our project manager gave an overview of the Gateshead Millenium Bridge and Northumbria University Footbridge, followed by a site visit to the north compound at Riverside Sunderland. The students enjoyed lunch trying a local regional delicacy - ham and pease pudding sandwiches!
The VolkerStevin team received great praise from the students, remarking that it was the best visit they have had so far.
Should have served them up a Curry Batter Bun - proper Sunderland baitI hope the ham and pease pudding was served in a stottie.
think a poster earlier said mid September....The barge we used isnt due into Rotterdam port in the next 72 hours
The longest section delivered by barge today.There's a post on skyscraper city of the next part coming in today
The longest section delivered by barge today.
Massive lift, possibly Monday.
The longest section delivered by barge today.
Massive lift, possibly Monday.
Both sections were on the barge - plenty of photos on Facebook, though you may have to be in the SR6 locals-with-pitchforks group to see them.The longest section delivered by barge today.
Massive lift, possibly Monday.
Is that the middle bit?
Thought they might have done south side first, the fixed the middle bit in last
Never had one.Should have served them up a Curry Batter Bun - proper Sunderland bait
I was expecting 2 smaller sections for the south pier install (big crane) then the mid connecting section will be lifted by 2 strand jacks (winches) from the south and north sectionsIs that the middle bit?
Thought they might have done south side first, the fixed the middle bit in last
I was expecting 2 smaller sections for the south pier install (big crane) then the mid connecting section will be lifted by 2 strand jacks (winches) from the south and north sections
I thought the whole bridge was 5 lifts but there only seems to be 2 on that barge unless theres a 3rd smaller one that cant be seen