Only open southbound initially and to early leavers to test load bearing integrity under surge conditions.Who will be volunteering to be first across.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Only open southbound initially and to early leavers to test load bearing integrity under surge conditions.Who will be volunteering to be first across.
Michael Beale and Danny DyerWho’s been chosen to cut the ribbon when it opens?
Monty?
Melanie Hill?
Rita from Corrie?
Sinbad from Brookside opened Park Lane Interchange iirc!![]()
notice lads on the scissor lifts busy on the apartment blocksFirst few panels going into place.
You must be logged on to see media items
Never get two cars passing each other on thatFirst few panels going into place.
You must be logged on to see media items
With the concrete deck panels on it shows the true 10m width of the bridge now as the steel structure below is much narrower and people were thinking its not wide enoughFirst few panels going into place.
You must be logged on to see media items
I'm not normally scared of heights. Hell I've jumped out of a mini with wings at Shotton Airport but that scares meYou must be logged on to see external links
You must be logged on to see external links4h • 4 hours ago
The deck panel placement has started on the New Wear Footbridge
91 panels in total will be used to form the bridge deck.
The 10m wide precast concrete deck panels will be installed north to south using a bespoke trolley system which is designed specifically for its use on the New Wear Footbridge
A panel is craned from the park to the deck trolley which then transports the panel along the deck and places it to its precise position on the bridge. Then returns for the next panel. Each panel will be ‘stitched’ to its neighbour.
Once all panels are stitched together the remaining deck finishes can commence.
The footbridge, a key part of Riverside Sunderland and one of more than £1bn of development projects live on the Riverside site right now, connecting the north and south side of the river.
You must be logged on to see external links
Logon or register to see this image
Logon or register to see this image
250 metresProbably been answered a million times but how long is the bridge?
Longer than I'd thought. Cheers.250 metres