• The first stage of the forum upgrades has now been completed but they remain in a degraded state and are still being worked on. Normal posting/reading should now be possible.
    Please read this thread for more details.
    New user registrations are currently disabled.

Keel Crossing [opened 18.10.25] - compendium thread


Just seen an article to say they're opening it at 2pm next Saturday with a fan walk over it from Keel Square! Sounds great, but SAFC are encouraging early arrival, anyone tagging onto the back of the "parade/walk" will do well to be on their queue by 2.20. I think this opening should be at 1.30🤷‍♂️
 
Just seen an article to say they're opening it at 2pm next Saturday with a fan walk over it from Keel Square! Sounds great, but SAFC are encouraging early arrival, anyone tagging onto the back of the "parade/walk" will do well to be on their queue by 2.20. I think this opening should be at 1.30🤷‍♂️
Opening is 1.30pm
 
Just seen an article to say they're opening it at 2pm next Saturday with a fan walk over it from Keel Square! Sounds great, but SAFC are encouraging early arrival, anyone tagging onto the back of the "parade/walk" will do well to be on their queue by 2.20. I think this opening should be at 1.30🤷‍♂️
Do it any earlier and you'd not get as many people willing to join in. It'll not take more than 15 mins for people to shuffle over.
 
I've been over the bridge and if you walk into the seats then it's your own fault for walking into the seats.

You seem unhappy enough without making things up to make yourself more unhappy about things. Look for the positives. There's loads if you open your eyes and look around the place.
Spot on. The whole area is getting a massive upgrade and injection of cash. Long overdue and its starting to transform what was an awful area.

Well done everyone involved, and keep it coming.
 
Tarmac is staying.

Too right we don't
ru sure about the tarmac? looks awful as it doesnt fit with the surroundings !..its usually done as a temp fixing and then replaced so i will wait till the 18th to see the final product before a believe you!
 
ru sure about the tarmac? looks awful as it doesnt fit with the surroundings !..its usually done as a temp fixing and then replaced so i will wait till the 18th to see the final product before a believe you!
Not a chance they’re ripping the tarmac up and replacing with block paving in the space of a week.
 
Not a chance they’re ripping the tarmac up and replacing with block paving in the space of a week.
Well its going to look awful then!I agree with you about the timeline but nowt to stop them doing it in piecemeal once the bridge was open and wouldn't involve shutting the bridge!Just do it when there is a big gap between home games !What designer would think it would be acceptable to have fancy paving interposed with bleeding tarmac?I really hope its a cockup with the ordering of the paving stones and not a design feature!
 
ru sure about the tarmac? looks awful as it doesnt fit with the surroundings !..its usually done as a temp fixing and then replaced so i will wait till the 18th to see the final product before a believe you!
Don't care if you believe me or not , it's staying.
 
Back
Top