• The first stage of the forum upgrades has now been completed but they remain in a degraded state and are still being worked on.
    Please read this thread for more details.
    New user registrations are currently disabled.

Keel Crossing [opened 18.10.25] - compendium thread


I get that bit. What I’m getting at is how it can be open if it’s not finished. It’s a genuine question.

I know. What I’m getting at is how can it be used at all when it’s not finished.

Assume its substantially complete and safety criteria met, but to finish the job it’ll be easier and safer to close altogether
 
I get that bit. What I’m getting at is how it can be open if it’s not finished. It’s a genuine question.

I know. What I’m getting at is how can it be used at all when it’s not finished.

Probably because health and safety signed it off as safe to use. I'm guessing all the appropriate risk assessments have been signed off.

A bit like when you download a game om xbox or PlayStation and it gets to 70% installed and the console says the game is ready to play but with some functions turned off. The essentials are done but the nice accessories are yet to be finalised.
 
Last edited:
I get that bit. What I’m getting at is how it can be open if it’s not finished. It’s a genuine question.

I know. What I’m getting at is how can it be used at all when it’s not finished.

It sounds like the surface they are using today is only temporary so that will need finishing. Cannot do the surface with people walking over it so I guess that's one of the reasons it will need to close again.
 
It sounds like the surface they are using today is only temporary so that will need finishing. Cannot do the surface with people walking over it so I guess that's one of the reasons it will need to close again.
Yeah, plus they need to sort all of the electrics and cosmetic elements which isn't an overnight job.
 
Back
Top