Queen Alex Bridge shut for 1 week



ISOE II

Midfield
Could it be something to do with the dual carriageway going underneath? Some health and safety malarkey?
 

Rob the Ref

Midfield
Probably a principal structural and condition inspection or maintenance work if one has already been done recently.
 

the boot

Winger
It’s amazing how the new bridge is empty and the QA is still congested like.
I go over both two or three times day.

The new bridge is class though and hopefully this closure will show people it’s okay to use.
 

Top