• The forum upgrades are now largely complete.
    Please read this thread for more details.
    New user registrations are currently disabled.

Keel Crossing [opened 18.10.25] - compendium thread


3 large joints and associated internal bracings all got to be welded to procedure, which means pre & post heat treatment. Then weld inspection, and coating after that.
I will have a gander over at it tonight when I walk over the Town Bridge when going to the match. If the scaffolding and tarpaulins are still up - then I would say that the welding/inspection process has not been completed.
Scaffolding, tarpaulin and strand jack apparatus/equipment still in place.
 
They are also building a overpass over the steps down to the riverside next to the stables meaning you should have direct line of sight from bridge to SW corner of stadium
Aye I think until the other remaining buildings are knocked down it’s hard to see.

I will say also it has not cost the club 1 penny so they can be thankful for that :D
 
Back
Top