• The first stage of the forum upgrades has now been completed but they remain in a degraded state and are still being worked on.
    Please read this thread for more details.
    New user registrations are currently disabled.

Keel Crossing [opened 18.10.25] - compendium thread


The screen could get moved further down high street to work in with all the building work down there that's on the horizon
 

Can easily put a portable one up for special events etc. It's only really needed for the warmer weather and it'll block the view of the new Culture House.


There was 5k at the last one, and they're aiming for 6k in 2026.
The bridge can take 3000 people at once, not strength just space. I had a construction visit and was told this before anyone says “how dee ya kna”.
 
I have noticed there is cabling hanging out the wall where the screen would go and the brickwork is all set back as if some big screen would be going there but must just be for a sign or summet
Yeh you can see some small light design still planned to go up

 
Back
Top