Sessegnons Mam
Central Defender
All of which can be surveyed now, and incorporated into the planning, ready for when the powers that be determine the time is right to reinstate.
All of which can be surveyed now, and incorporated into the planning, ready for when the powers that be determine the time is right to reinstate.
How do you accurately survey a pipeline for strain/damage under a concrete coating? I think they would need an ILI. Maybe wouldn’t delay it much but would need the line to be connected or there would be floating pigs